It was carried out in line with the implementation of the “Program of Action on Acceleration of Socio-Economic Development of the Towns of Baku” approved by President of Republic of Azerbaijan Ilham Aliyev. A new water line has been laid in Bilgah settlement, which there has been drinking water problem for many years. The pipeline has taken its start from the reconstructed Mashtaga central water reservoir. “Azersu” Joint Stock Company made a main water line of 300 millimeter pipes to this settlement. A water reservoir with a capacity of 1000 cubic meters was built to collect the water coming through the pipeline. The new pumping station next to the reservoir will ensure the continuous distribution of water to the settlement.